Profile Projects
- Owner: Westwood Country Club
- Architect: Webber Studios
- Structural Engineer: Structures
- Contract Amount: $1,979,871
Project consisted of demolishing a 38-slip marina built in 1953 and building a 50-slip marina in the same footprint. ... read more»
- Owner: Zachary Scott Theatre Center
- Structural Engineer: Structures
- General Contractor: JE Dunn Construction
- Contract Amount: $301,462
Project consisted of driving 228 – 8-5/8” OD pipe piles that ranged from 39 to 61 feet due to an excavated pit for the theatre’s trap.
-
Project consisted of removing sediments from Michael’s Cove connected to Lake Austin along Westlake Drive. read more»